branch line
英 [brɑːntʃ laɪn]
美 [bræntʃ laɪn]
n. (铁路)支线
柯林斯词典
- (铁路)支线
Abranch lineis a railway line that goes to small towns rather than one that goes between large cities.
英英释义
noun
- a railway line connected to a trunk line
双语例句
- The railway company extended a branch line to Brightlingsea to convey fish direct to Billingsgate.
铁路公司修建了一条通往布赖特灵西的支线,以便直接将鱼运送到比林斯门。 - Since it is very import of Pacific route, this article uses quantitative method to calculate the transport cost of branch line when choosing ports between Pacific-Asian ports.
并考虑到太平洋航线的重要性,在太平洋亚洲港口的选择中,采用了定量方法测算了支线网络的运输成本。 - In general, based on the analysis. a brief description of the line leading to the main branch line is serious.
在一般分析的基础上,简要说明了导致该行网点排队现象严重的主要原因。 - Branch line of business looks, public utility, information the cash solvency of two industries is first-rate, because, be of these two industries advocate business Wu income is service cash income more, is not receivable, liquidity is accordingly good of course.
分行业看,公用事业、信息两个行业的现金偿付能力非常好,是因为这两个行业的主营业务收入多为服务性的现金收入,而不是应收帐款,因此流动性当然好。 - The three of them influences on each other, which leads to the spatial differentiation of the container transportation's function. In consequence, the load center, lateral port, main line and branch line have been formed and constituted a complex container transportation network system.
港口、船舶及内陆运输网络的规模经济相互影响,造成了集装箱港口功能在空间上的分化,形成了枢纽港和支线港、干线航班和支线航班,并形成了一个复杂的集装箱港口运输体系。 - In the programming of water injection branch line, a mathematical model aimed at system investment and reliability was proposed, the resolve method of this model was also provided.
在注水支线管网的规划中,提出了以系统投资和系统可靠性为目标的数学模型,并对模型进行了求解。 - We registered their call, orange branch line.
我们注册了他们的线路,橙色的就是。 - The London train pulled into the branch line station.
伦敦来的火车进站后停靠在支线站台旁。 - Some microstrip structures such as microstrip line, patch antenna and microstrip branch line coupler have been simulated and the characters of these elements have been analysed.
利用FDTD法分别对微带传输线、矩形微带贴片天线和微带分支耦合器进行了仿真和特性分析。 - The programming method of the ground flooding system was studied in this paper and the total optimization problem was separated two parts, the programming of water injection branch line and that of water injection trunk line.
对于油田地面注水系统的规划技术进行了研究,采用分级优化的策略,将整个系统的规划问题分解为注水支线管网的规划和注水干线管网的规划两部分。